Construction of the Atom Smasher Mk II began in July 2007. The initial steps included fabrication of turret-loaded boards and installation of components. Click on thumbnails to see full sized (1600 X 1200) images.
![]() |
![]() |
|---|---|
G10 boards w/turrets |
Completed circuit boards |
Construction of the chassis was completed in mid-August. The chassis was fabricated by Mike Schuette with some help from Mason Wolak. The images show the chassis with tube sockets, grommets, and wire loops mounted.
![]() |
![]() |
|---|---|
| Top view of chassis | Underside view of chassis. |
The first step in preparing the chassis was to mount the transformers, AC mains and fuse, then wire them to the mounted hardware. 1/2" standoffs were also mounted to prepare for inclusion of the circuit boards.
Once the hardware was successfully mounted and wired into place, the circuit boards were added. Three boards were used, one for power amp rectification, one for power supplies for the power tube and phase inverter, and one for the preamp. These were wired to their respective tubes and variable resistors as per the schematic.
Here's the current state of the amp with the tubes mounted. Cosmetic design is underway. The image also shows the Atom Smasher Mk I, with construction of casing and completed face plate.